Had a pretty good week this past week. Lots of things happening at the ski area and, as usual, lots to fix! Got the generator working and charging again. Providing power to the bottom of lift 3. Very critical component to the lifts. Must have 3 phase 480 volts to heat the bottom terminal There is no power line going down there, must have the generator.
It's been a mush better season this year. I upgraded the generator heater and added one more 480 volt, 10 Kw heater, inside the terminal. Much better!
It's been a mush better season this year. I upgraded the generator heater and added one more 480 volt, 10 Kw heater, inside the terminal. Much better!